Gantt, SC

Hail map for Gantt, SCSeptember 21, 2026

NOAA radar detected hail up to 1.00″ — quarter size — within 5 miles of Gantt on September 21, 2026.

Hail swath map for Gantt, SC on September 21, 2026 showing 1.00 inch hail.
Roofing contractors

Claim your live interactive hail map

Every address in South Carolina at once — three years of NOAA hail swaths drawn on a map you can zoom, filter and actually work.

HailMate's canvassing map: hail swaths colour-banded by stone size, from yellow through red to purple, laid over a satellite view of a Texas territory, with hail swath and territory controls.

$79/moall of South Carolina, not one storm day

  • The September 21, 2026 swath — and every other storm since 2023 across South Carolina
  • GPS door-knocking — pins, photos and who you have already hit
  • Jobs, contacts, estimates and invoices included
  • An alert the next time South Carolina gets hit
See the hail map See a sample map first

HailTrace charges $229 for this one day, once. $79 here is all of South Carolina, every day.

Max hail size
1.00
quarter
Impact rating
3/10
from stone size
Size bands over the city
1
distinct radar bands

Sizes come from NOAA radar, which runs about ±0.25″ against ground truth. It is canvass-targeting quality, not claim evidence.

Homeowners

Did hail hit your address?

This page covers Gantt as a whole. Check your own address to see every storm on record for your roof — the date and the stone size for each one — and we'll email you the full report to keep.

Check my address

Free, and no account needed to look it up. If hail did hit, you'll have the date and the stone size in writing — which is the first thing an adjuster asks for.

FAQ

Gantt hail on September 21, 2026

NOAA radar estimated stones up to 1.00 inches — quarter size — within about 5 miles of Gantt that day, across 1 distinct size band. Sizes vary street to street inside a single swath.

Knock the Gantt streets this storm hit

Your whole state at street level, with this swath already on the map — $79/mo, cancel anytime.

One state, everything included · from $79/mo · month-to-month, cancel anytime